PointsOnly
PointsOnly
  • Collapse Menu
  • Trending
  • Popular
PointsOnly
PointsOnly
Sign In / Sign Up
MAIN SECTIONS
  • Collapse Menu
  • Trending
  • Popular
Sign In / Sign Up
  • Create Pointer

  • Create Story
How to Save 20% time and cost with Streamlined MEP BIM Workflow
by Gaurang Trivedi
- 7 month ago |  171
author
  • Contracting companies can leverage the entire spectrum of BIM with long-lasting advantages.
  • The presence of an MEP BIM workflow helps contractors make smarter decisions, build design prototypes, generate fewer RFIs, and streamline construction activities.
  • The use of data-rich 3D models reinforced with existing workflows can help speed up the design and construction process.
  • Read more
0 0